Estimate how much irrigation water your curing pile needs per month and per year.
Original calculation credit: Craig Coker
Measured moisture of the pile as-is.
Target moisture for optimal curing (typically 45–60%).
Total duration of the curing phase.
Average precipitation per month over the curing period.
% of rainfall that does not enter the pile.
Water lost to evaporation per month (0 = not applicable).
© 2026 Wanu Organics PLLC